What is the installation process for Full Fibre Business Broadband, and how long does it take?
Learn the installation process for Full Fibre Business Broadband, its duration, and how virgin media for business can boost your connectivity.
The installation process for Full Fibre Business Broadband typically begins with a detailed site survey and service qualification, followed by external network preparation and an internal fit-out at your premises. After an initial consultation to confirm your requirements, an engineer or surveyor will assess your building layout, existing cabling, and the route from the street to your comms room or chosen termination point. This survey identifies whether any additional civil works, such as ducting or pole access, are required. Once the survey is complete and the design is agreed, an installation date is scheduled. On the day, engineers install fibre from the nearest network access point into your premises, terminate it on an Optical Network Terminal (ONT) or similar device, and connect it to your router or firewall. They will then test performance, configure the connection, and ensure your key services are operating correctly.
The total time from order to live service can vary significantly depending on your location, building type, and whether fibre infrastructure is already present. For premises already served by full fibre, activation can sometimes be completed within 10–20 working days. Where new fibre needs to be built to your site, the process can extend to 30–90 days or more, particularly if wayleaves, landlord permissions, or roadworks are required. The on-site installation visit itself usually takes between half a day and a full day, depending on complexity. Throughout the process, you should receive updates on survey findings, planned works, and go-live dates, allowing you to plan around any disruption and ensure a smooth transition to your new full fibre connection.

The process usually starts with order placement and service qualification, where your address is checked against existing fibre infrastructure. A survey is then arranged to confirm the route into your premises, identify any construction requirements, and agree the best location for equipment such as the ONT and router. At this stage, any permissions from landlords or local authorities are requested if needed.
Next comes the external build and installation. Engineers bring fibre from the nearest network point to your building, which may involve underground ducting or overhead cabling. Once the external work is complete, an appointment is booked for the internal installation, during which fibre is routed inside, terminated, and connected to your network equipment.
From start to finish, straightforward installations can often be completed within a few weeks, while more complex projects involving new infrastructure or wayleaves can take several months. Clear communication with your provider helps minimise downtime and ensures a well-planned migration.